Day 16 – Big time progress!

We finished two chunks of the project today. The tile installation is done. The only tile stuff left to do is the grout and clean up. If you look close at the pictures you can see where there is a dusting from smears of thinset on the tiles. We need to scrape and wipe all of that off before grouting them.

The other big task that is done is the drywall installation. I closed up the wall on the backside of the showerhead. It looks good. All that is left there is mud/tape/sand – repeat 3 times. We are closing in on the finish.